Hubungan Waktu Kerja Dengan Kelelahan Pada Pekerja Pengecoran Proyek East Connection Taxiway Tanggerang Tahun 2019

Ismayanti Fauziah, Yesi (2019) Hubungan Waktu Kerja Dengan Kelelahan Pada Pekerja Pengecoran Proyek East Connection Taxiway Tanggerang Tahun 2019. Bachelor thesis, Universitas Binawan.

[img] Text
skripsi_yesi ismayanti.pdf
Restricted to Repository staff only

Download (1MB)
Item Type: Thesis (Bachelor)
Subjects: R Medicine > R Medicine (General)
R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine
Depositing User: Cambari
Date Deposited: 27 Jul 2023 07:36
Last Modified: 27 Jul 2023 07:36
URI: http://repository.binawan.ac.id/id/eprint/3203

Actions (login required)

View Item View Item